Heber City, UT
Heber City, UT
Ralph L. Wadsworth Construction completed a new 4 MGD surface water treatment plant. The construction consisted of a 25,000 square foot building, a treatment chemical feed system, a cast-in-place clear well basement with a finished water pumping facility above which includes three turbine pumps, and a raw water snowmaking pump station with six vertical turbine pumps.
166 East 14000 South, Suite 200
Draper, Utah 84020
7990 Miller Drive, Suite 200
Frederick, Colorado 80504
6990 W. Kuna Mora Road
Kuna, ID 83634-2765
Copyright 2025 © – Ralph L. Wadsworth Construction Company – All Rights Reserved