Salt Lake City, UT
Salt Lake City, UT
Ralph L. Wadsworth Construction built a deep foundation system for the airport’s redevelopment, consisting of 173 miles of 26 different lengths of driven piles (5,800 total piles). Deep foundation work included a tunnel extension to connect passengers to the new terminal that required piles driven to a depth of 120 feet on both sides of the existing tunnel.
166 East 14000 South, Suite 200
Draper, Utah 84020
7990 Miller Drive, Suite 200
Frederick, Colorado 80504
6990 W. Kuna Mora Road
Kuna, ID 83634-2765
Copyright 2025 © – Ralph L. Wadsworth Construction Company – All Rights Reserved