NORTH TEMPLE VIADUCT TRANSFER STATION

Salt Lake City, UT

Ralph L. Wadsworth Construction built a vertical steel superstructure and roof system that guides commuters up to the Trax Airport Station or down towards the FrontRunner Commuter Station. The firm coordinated with UTA and the design team to analyze and validate cost, produce a thoroughly vetted schedule, and correct all constructability issues. The team resolved all challenges regarding elevation issues, elevators, security cameras, lighting, scheduling and logistics for the architectural glass, and maintaining UTA operations.

CORPORATE OFFICE

COLORADO OFFICE

IDAHO OFFICE