The US-89 State Street Railroad Bridge Project in Pleasant Grove will solve a long term bottleneck problem in the area.

The project consists of constructing a new bridge that will carry US-89 (State Street) traffic over the Provo Industrial Lead Railroad Track. The new bridge will utilize precast deck panels, an Accelerated Bridge Construction (ABC) technique, which will help shorten the project duration.

We will also install 7,500 ft of pipe, 300,000 tons of dirt, 48,000 sq ft of MSE Retaining Walls, and relocate 1900 ft of railroad track