Payson Bridge Deck Replacements and Ramp Widening

On April 15, 2009 RLW was awarded the Payson Project. The project is a Design-Build and consists of the replacement of six dilapidated bridge decks, structural concrete rehabilitation work and a ramp widening with intersection improvements. The bridge decks are located in Payson, UT at Main Street, 400 north, and Utah Avenue. The work consists of removing the existing decks carefully to prevent damage to the existing girders and replace them with precast deck panels and a polymer overlay. The ramp widening is at the southbound off-ramp from I-15 to Payson Main St. which will be widened to accommodate turn lanes. A new signal will also be installed. The project is very fast-paced with stringent guidelines for traffic impacts. UDOT has requested there be no south bound traffic impacts on Fridays from 2 to 9 pm. Huge incentives and disincentives are tied to this requirement.

The project management team consists of the following: Project Manager: Kyle Leishman Project Superintendant: Scott Wiscombe

Baker Engineering will be providing the design for the project.

Comments are closed.