Silver Bowl and Archery Weir – Las Vegas, Nevada

These 2 separate weirs were located in the Las Vegas Wash river-way immediately adjacent to the Clark County Wetlands Park.   The wash, sometimes called and “urban river”, is a 12 mile long channel which feeds most of Las Vegas Valley’s …

Sugarhouse 2100 South

This project is a complex effort removing just 70,000 square feet of the 125,000 square that was the old home of Granite Furniture  in Sugarhouse while leaving the rest standing.  The original building consists of  basement space and three above …

Various Piling/Shoring Projects

RLW performs a variety of piling and shoring construction. The attached slideshow shows a variety of applications for both public and privately owned projects

I-15 CORE

Provo River Contractors, an association of local and national contractors, won the job with a proposal that will stretch the $1.725 billion budget from Lehi down to Spanish Fork. The group’s proposed December 2012 finish date — two years ahead …

BYU Richard Building- 2009

BYU Campus Utility Tunnels- Phase 3 A- 2009

(1 of 4 similar Projects on the BYU Campus) The work included installation of a sheet-pile type shoring system for the construction of a utility tunnel connecting BYU’s new Broadcast Building to its central heat plant. Over 53,000 square feet …

West Valley Airport- 2008

Central Weber Sewer- 2008

China Bridge Parking Structure- 2005

A parking structure built for the city of Park City- RLW provided a design build permanent shoring system to retain City Hall. The design had to take into consideration mine till that varied in size and make up as well …