Mass Transit

Ralph L. Wadsworth Construction Company is proud to be part of the Commuter Rail Constructors Team. The Ralph L. Wadsworth Team was able to utilize our expertise in Shoring, Piling, Structural Steel Erection, and Bridge construction on the following Utah Transit Authority commuter rail systems: West Valley Trax, FrontRunner, and FrontRunner South.

SH-5 Rail Road Bridge Plummer, Idaho

This project will be a complete replacement of existing 511’, 7-span structure with new 511’, 5-span structure.  Bridge extends over a single Union Pacific Rail Road line, 2 Saint Maries River Rail Road lines, and the Plummer Creek.  Project will …

Front Runner South- 2008

This project is a UTA CMGC project that extends the Front Runner North project 45 miles from downtown Salt Lake to Provo. RLW is working in conjunction with CRC, a Stacy and Witbeck Inc. / Herzog Joint Venture. RLW’s portion …

West Valley Airport- 2008

This project is a CMGC project for UTA (Utah Transit Authority). RLW is a CMGC partner with Stacy and Witbeck / Kiewit Joint Venture. The project that is slated to be completed in 2010. RLW’s portion of the work consists …

State Street & 7200 So. State UTA TRAX

After decades of dangerously restricted road widths that hampered smooth traffic flow, UDOT enlisted RLW to provide a new overpass structure for the UTA Trax over State Street @ 7800 South project. The new structure was built in two phases, …

UTA Commuter Rail- 2005

As part of a $581 million, 35-mile, 8-station Front Runner Commuter-Rail line that began operations in the Spring of 2008. Wadsworth’s scope of work for the project included the construction of two major bridge structures erected over the Union Pacific …