Heavy Highway

Innovation is the key to our success – the attribute that sets us apart from our competitors. From the beautiful, eye-catching concrete murals on freeway interchanges to new techniques in bridge construction, the Ralph L. Wadsworth Team finds new ways to deliver projects; and always with an eye towards quality. Our approach to each project is one of efficiency, economy, and ingenuity.

Each project presents new opportunities for creative delivery methods. Projects are evaluated on a number of categories including quality, constructability, value to the client, schedule savings and budget. Our customers depend on us to build the best projects possible and we take that role seriously. The Ralph L. Wadsworth Team finds numerous ways to add value to each project for our clients.

Ralph L. Wadsworth Construction Company works within many types of contract delivery methods including design-build and construction management/general contractor (CMGC). Working with the entire project team – designer, client, and contractor – offers us many opportunities to add innovative construction processes and value into each project.

Skyway Bridge – North Metro Rail – Denver, Colorado

We are very excited to get back into Colorado on another Major Rail project and are looking forward to working closely with the Balfour Beatty/Graham joint venture team, who will be the Construction Manager of the project.  Ralph L. Wadsworth Construction Company …

Greensferry Overpass – Post Falls, Idaho

This project consists of the design and construction of a new overpass extending Greensferry Road over I-90.  Project includes design of bridge structure, MSE retaining walls, and roadway elements.  Project utilized effective design to minimize Right-of-Way needs for the project.  …

SH-55 North Fork Payette River Bridge – McCall, Idaho

RLW teamed with Lochner for the design and construction of this design-build project for the Idaho Transportation Department. The existing five-span bridge carrying SH-55 over the North Fork of the Payette River was deteriorating and in need of replacement. RLW …

I-15 – Payson Interchange to Spanish Fork River

The Payson Project is a $22 million design build project with 7 months to design and construct the widening of 6.5 miles of I-15 including the widening of 8 structures.  This fast paced project started in March and is scheduled …

I-90 Beck Road Interchange, Idaho

The I-90 Beck Rd Interchange in Post Falls ID is a unique  Design-Build project that is being built by a Developer and is being partially  financed by Ralph L. Wadsworth through the State of Idaho STAR Fund program.   The interchange …

Bangerter Highway at 7800 South

This 35 million dollar design build  project was awarded to the RLW team in early spring 2011.   The project included the construction of  continuous flow intersections at 6200 south and 7000  south along the highly traveled Bangerter highway as well …

SR 24 202L to Ellsworth, Arizona

  SR24 202L to Ellsworth is a $71.5 million 18 months Joint venture with Banicki construction in the  Mesa, Arizona area.  The project consists of two large flyover structures totaling over 6000 linear feet as well as two box-beam, post-tensioned bridges, two …

I-15 CORE

The I-15 CORE Project is a 3-year $1.1 Billion Dollar Project widening and updating I-15 corridor being performed by Provo River Constructors (PRC), a joint venture of Ralph L. Wadsworth Construction, Fluor, Ames and Wadsworth Brothers Cnstruction.  The project consists of …

Dixie Drive Interchange

Dixie Drive Interchange is a 60 million dollar CMGC project. We are constructing a new SPI (Single Point Interchange) bridge over I-15, 4 new bridges over the Santa Clara River, and a bridge over Convention Center Drive. We are also …

I-15 Layton Interchange

The South Layton Project is a $61 million design build project located near the Kaysville/Layton border. The project manger is Brandon Squire, construction manager is Scott Gubler, structures manager is Richard Evans, and the project coordinator is Sherry Michelson. The …