Monthly Archives: August 2012

Sugarhouse 2100 South

This project is a complex effort removing just 70,000 square feet of the 125,000 square that was the old home of Granite Furniture  in Sugarhouse while leaving the rest standing.  The original building consists of  basement space and three above …

I-90 Beck Road Interchange, Idaho

The I-90 Beck Rd Interchange in Post Falls ID is a unique  Design-Build project that is being built by a Developer and is being partially  financed by Ralph L. Wadsworth through the State of Idaho STAR Fund program.   The interchange …

Bangerter Highway at 7800 South

This 35 million dollar design build  project was awarded to the RLW team in early spring 2011.   The project included the construction of  continuous flow intersections at 6200 south and 7000  south along the highly traveled Bangerter highway as well …

SR 24 202L to Ellsworth, Arizona

  SR24 202L to Ellsworth is a $71.5 million 18 months Joint venture with Banicki construction in the  Mesa, Arizona area.  The project consists of two large flyover structures totaling over 6000 linear feet as well as two box-beam, post-tensioned bridges, two …

I-15 CORE

The I-15 CORE Project is a 3-year $1.1 Billion Dollar Project widening and updating I-15 corridor being performed by Provo River Constructors (PRC), a joint venture of Ralph L. Wadsworth Construction, Fluor, Ames and Wadsworth Brothers Cnstruction.  The project consists of …

Two Medicine River Bridge

This project is located on US 2 (National Highway Route 1) beginning at RP 209.8 just east of the town of East Glacier, Montana and extends 0.9 to RP 210.7. The project is located entirely within the boundaries of the …

Salmon Challis Bridge

This project is the replacement of three Forest Service bridges near Salmon Idaho, two located over the Salmon River and one is a small bridge over Pine Creek as well as the re-graveling of 11.5 miles of roadway.. The two …