Monthly Archives: February 2004

I-15 at SR-75 Interchange- 2004

This project’s structure was designed to have a life span of at least 75 years. Intersecting I-15 and  SR-75 in Springville, Utah, the interchange structure features the use of lightweight fill to minimize settlement. The structure also features a water …

SR 201 DESIGN BUILD- 2004

The SR-201 design-build project was a two phased reconstruction that entailed expanding SR-201 to three lanes of traffic in each direction – from 900 west to 4000 west. In addition, RLW constructed a new SPUI interchange at Redwood Road and …