Heavy Highway Projects

I-15 Bridge Rehab at I-215 – Salt Lake City, Utah

This $985,000 project involved the rehabilitation of 2 bridges on a fast track schedule of just 54 days between May and July of 2015.   Construction tasks included a total of 6 expansion joints and 8 closure pours were removed …

Midland Drive – SR-108 – Roy, UT

The Midland Drive project is a $9 million project with the Utah Department of Transportation Region 1. The project consists of 1.25 miles of urban reconstruction, and Portland Cement Concrete Pavement. The project began in December of 2014 and is …

Brush Creek Bridge on US-6 – Eagle, CO

The Brush Creek project is located just off the boundary of the White River National Forest 5 miles from the Eagle Vail airport on US-6. The bridges spans over the Brush Creek River 120 ft. Due to the high demand …

Twin Bridges – Burley, Idaho

Ralph L. Wadsworth is excited to work with the Idaho Transportation Department on yet another challenging project. The project site is located on I-84 over the Snake River just east of Burley, Idaho. The primary scope of the project consists of …

Greensferry Overpass – Post Falls, Idaho

This project consists of the design and construction of a new overpass extending Greensferry Road over I-90.  Project includes design of bridge structure, MSE retaining walls, and roadway elements.  Project utilized effective design to minimize Right-of-Way needs for the project.  …

SH-55 North Fork Payette River Bridge – McCall, Idaho

RLW teamed with Lochner for the design and construction of this design-build project for the Idaho Transportation Department. The existing five-span bridge carrying SH-55 over the North Fork of the Payette River was deteriorating and in need of replacement. RLW …

US-91 Diverging Diamond Interchange – Brigham City, UT

Original Contract Amount:  $7,248,476.37 Awards:  AGC Rural Highway Project of the Year   The 1100 South project is an A + B bid project, with 330 days being bid. It consists of replacing the existing structure over I-15, and reconfiguring the …

I-15 – Payson Interchange to Spanish Fork River

The Payson Project is a $22 million design build project with 7 months to design and construct the widening of 6.5 miles of I-15 including the widening of 8 structures.  This fast paced project started in March and is scheduled …

I-90 Beck Road Interchange, Idaho

The I-90 Beck Rd Interchange in Post Falls ID is a unique  Design-Build project that is being built by a Developer and is being partially  financed by Ralph L. Wadsworth through the State of Idaho STAR Fund program.   The interchange …

Bangerter Highway at 7800 South

This 35 million dollar design build  project was awarded to the RLW team in early spring 2011.   The project included the construction of  continuous flow intersections at 6200 south and 7000  south along the highly traveled Bangerter highway as well …