Projects - Piling / Shoring

view larger

Front Runner South-2008

view larger

West Valley Airport-2008

view larger

BYU Campus Utility Tunnels - Phase 3 A-2009

(1 of 4 similar Projects on the BYU Campus)

The work included installation of a sheet-pile type shoring system for the construction of a utility tunnel connecting BYU’s new Broadcast Building to its central heat plant. Over 53,000 square feet of braced and cantilever sheet-pile was installed and removed to facilitate the tunnel’s construction. Work occurred in the middle of BYU’s campus during the ongoing school year. As a result, the working space was limited, and schedule and safety concerns were paramount. Close coordination was required to ensure that the project was completed on-time and with minimal impact to BYU’s daily operations, functions and events. Ralph Wadsworth Constructions work was constructed ahead of Schedule and on time.

view larger

BYU Richard Building-2009

view larger

Central Weber Sewer-2008

view larger

China Bridge Parking Structure - 2005

A parking structure built for the city of Park City- RLW provided a design build permanent shoring system to retain City Hall. The design had to take into consideration mine till that varied in size and make up as well as construction limitations within a tight city populated area.
view larger

Various Piling / Shoring Projects

RLW performs a variety of piling and shoring construction. The attached slideshow shows a variety of applications for both public and privately owned projects